Written Reply by Minister for Transport Khaw Boon Wan to Parliamentary Question on Update on Construction of Lifts at Pedestrian Overhead Bridges
9 January 2017
This article has been migrated from an earlier version of the site and may display formatting inconsistencies.
Mr Ang Wei Neng asked the Minister for Transport
a. whether he can provide an update on the construction of lifts at pedestrian overhead bridges; and
b. whether LTA can consider expediting the construction of lifts at the pedestrian overhead bridge that links to the Chinese Garden MRT station.
Reply by Minister for Transport Khaw Boon Wan:
1. Lifts have been installed at 18 of the 47 pedestrian overhead bridges identified for the lift retrofitting programme. Preliminary works at the overhead bridge at Chinese Garden MRT station have begun, and the lift installation should be completed by the end of the year.
