Mr Chua Kheng Wee Louis asked the Minister for Transport
a. when is the three-runway system at Changi Airport expected to be operational; and
b. what is the projected increase in the airport’s passenger handling capacity thereafter.
Reply by Minister for Transport Chee Hong Tat:
1. The Member could refer to the written reply issued for Parliamentary Question No 14 for written answer for the 4 October 2022 Parliament Sitting.